Hydrographic survey measures below the waterline and ties it to the survey above it. The join is the hard part: two sets of measurements taken by different methods have to end up in one continuous surface, referenced to the same vertical datum.
What this covers
PLI supports waterway systems work including inspection and survey of mines, sewage treatment plants and contaminated waterways, along with seafloor and bed mapping.
Why the above-water half decides the job
Depth measurement is only as good as the position and the height it is attached to. That makes GNSS, control and tide or stage referencing the parts most likely to go wrong, and they are exactly the parts PLI supports directly with receivers, control work and calibration.
Talk to us early
Hydrographic projects vary more than most, and the right configuration depends on water depth, access and what the deliverable has to prove. Contact your nearest office before committing to a specification.